Priority 30 Years of Experience

DEALER SOLUTIONS

Dealer Solutions develop high quality websites and software that assist car dealers to manage their stock control and registration processes.

As a successful and growing business, Dealer Solutions were outgrowing their office space in Albion, where they had been for seven years. They wanted to update their office space to reflect the importance and present a fresh and modern image for the company and allow for further growth.

We met with Dealer Solutions to develop the brief and initial design concepts. They selected us to take on the project, based on offering the best suggestions and solutions to transform their existing space. Key criteria were creating a professional image, while utilising the existing floor space.

A well-planned Construction Program was prepared which would be completed three key stages:

Stage 1 - Relocation of the server room – the digital heart of the business; with minimal disruption to business operations.

Stage 2 - The new workspace and offices were constructed while staff were relocated downstairs to the ground floor temporarily with minimal dust and noise impact.

Stage 3 - Staff relocated back to their new bright and airy offices. The ground floor renovations include the new server room, staff room, boardroom, training room, meeting room, and breakout area.

The stylish new layout met all Dealer Solutions’ requirements and transformed an existing tired interior, into a fun and practical place to work.

  • dealer
  • dealer
  • dealer
  • dealer
  • dealer
  • dealer
Project Details

Dealer Solutions – Office Refurbishment & Fitout
10 Hudson Rd, Albion
Total floor area: 428m2

Project Schedule:
Preconstruction: 8 weeks
Construction: 15 weeks

Project Team
Project Manager: Steve Knight
Project Administrator: Garry Stone

“We did give the brief to another company but in the end we felt that Priority could get the job done best. We were very impressed with the ideas Priority came up with. And the job on the whole ran a lot smoother than I expected with all aspects of the job handled really well.”

Mick Edwards,Director – Dealer Solutions

Project Scope

  • Design documents & approvals
  • New PWD & shower facility
  • Relocate server room
  • First floor feature flooring – vinyl, carpet & tiles
  • 2-Pac flooring – ground floor
  • Layout
  • Boardroom
  • Training room
  • Staffroom
  • Enclosed offices
  • Open plan meeting spaces
  • Open plan work area
  • Hot desks
 
Push to Call Us Now
© Priority Building | QBSA Lic Nº 45510